FREQUENTLY
News
- The drilling rig is strictly prohibited from rotating while unloading
- Rotation at the connection sleeve of the drill pipe
- Construction conditions for drilling tools
- The various components of drilling tools
Contact us
Contacts: Ricky Zhu
Mobile phone: +86-13861387317
Telephone: +86-511-86333316
Mailbox: 269046430@qq.com
Address: Danbei Town, Danyang City, Jiangsu Province
FREQUENTLY
-
2024-04-26 13:58:07
Drilling construction meets design requirements
After the drilling construction meets the design requirements, sufficient pressure air or water should be used to blow or rinse off the resi...
-
2024-04-26 13:52:19
Drill forward after connecting the drill pipe
After drilling to a certain depth and the drilling rig and tools are running smoothly, use normal rotation and normal feed speed to expand t...
-
2024-04-26 13:47:06
The drilling rig needs to be connected before drilling
After the drilling rig is moved into place, stable drilling work is carried out according to the drilling design parameters.
-
2024-04-26 13:40:35
Drilling rig handling process
The safety responsible person for handling the drilling rig shall bring all personnel handling the drilling rig to the site and count the eq...

苏公网安备32118102001045号